top of page

CASE STUDY — Australian Government Site · Sydney, NSW

Independent proof on an operational Australian Government site

A 12-month deployment on an existing 73 kW packaged HVAC unit—independently measured and verified by CSIRO and METHREP.

CSIRO + METHREP

24,570 kWh p.a.

2.39-year payback

MEASURED RESULT

40.6%

measured annual HVAC savings

Existing HVAC retained

Background.png

Australian Government site · existing plant retained

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

01 / THE CHALLENGE

Prove the saving without compromising an operational site

The Australian Government site needed evidence that HVAC efficiency could be improved on existing assets while preserving the building conditions the facility depended on.

The result had to withstand independent technical scrutiny—not just show a lower bill. That meant measuring electrical input, HVAC output and maintained conditions over a full 12-month period.

The test was not simply whether energy could be saved—it was whether every saving could be measured and defended.

BUILDING PROFILE

Asset overview

Facility

Office / classroom

HVAC system

73 kW dual-circuit packaged unit

Deployment

Australian Government site with BGIS

Monitoring

12 months

Verification

CSIRO NP0031 + METHREP

02 / THE CRESSTEC APPROACH

Measure what it uses. Measure what it produces. Control from both.

HDAC builds the proof into the optimisation process—on the equipment already installed. Anything less isn't HDAC.

01

Instrument the unit

Sub-meter overall power and each compressor, then measure conditions and delivered HVAC capacity across both circuits.

02

Optimise from both sides

Deterministic AI uses energy consumed and output produced to optimise operation while maintaining the required environment.

03

Verify over 12 months

Compare like-for-like operating data and subject the measured result to independent CSIRO and METHREP review.

Independent evidence, built on a live site.

03 / VERIFIED RESULTS

The deployment converted an operational result into a defensible engineering and commercial case for wider adoption.

40.6%

Annual HVAC savings

Measured over 12 months

24,570

kWh saved p.a.

Existing plant retained

16.22 t

COâ‚‚-e avoided p.a.

Measured reduction

2.39 yrs

Simple payback

At $0.22/kWh

BUSINESS CASE VS MEASURED RESULT

Measured performance exceeded the pre-install estimate.

04 / BUSINESS OUTCOME

Measured. Defensible. Ready for a decision.

Independent review

CSIRO and METHREP

Monitoring period

12 months

System approach

HDAC retrofit to existing HVAC

Predictive-maintenance case

1.21-year payback including benefit

bottom of page