CASE STUDY — QSR · Brisbane, QLD

Measured savings through long, demanding trading hours

HDAC optimised the installed packaged HVAC while maintaining restaurant conditions and continuously measuring the result.

$12,557 p.a.

29.72 t CO₂-e

1.82-year payback

MEASURED RESULT

42.7%

measured annual HVAC savings

Existing HVAC retained

cd0347_6680944edfb54e34b75e2da8c42f0aef~mv2.jpg.png

Real-world QSR site · extended operating hours

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

01 / THE CHALLENGE

Reduce HVAC cost in an environment that rarely slows down

Quick-service restaurants combine long trading hours, high internal heat loads, frequent door openings and constantly changing occupancy. Comfort must be protected while kitchen and dining conditions move throughout the day.

The commercial question was whether the existing HVAC could be optimised without disrupting service—and whether the savings could be demonstrated at unit level after installation.

The restaurant could not trade comfort for efficiency. The system had to deliver both, continuously.

BUILDING PROFILE

Asset overview

Facility

High-traffic quick-service restaurant

Location

Brisbane metropolitan area

HVAC system

Extended hours, variable heat load

Deployment

July 2025

Verification

IPMVP Aligned A/B toggle testing, continuous equipment-level M&V

02 / THE CRESSTEC APPROACH

Measure what it uses. Measure what it produces. Control from both.

HDAC builds the proof into the optimisation process—on the equipment already installed. Anything less isn't HDAC.

01

Measure the real load

Capture HVAC power, delivered heating or cooling and conditions across the unit as the restaurant load changes.

02

Optimise continuously

Adjust compressor and fan operation in real time while preserving the conditions required for service.

03

Prove the annual result

Use measured unit data and weather-normalised analysis to quantify the annual saving after commissioning.

The saving exceeded the business case.

03 / VERIFIED RESULTS

Measured annual HVAC savings finished more than 70% above the 25% pre-install estimate while the restaurant continued operating.

42.7%

Annual HVAC savings

Measured average

$12,557

Annual cost saving

Comparable Brisbane QSR

29.72 t

​CO₂-e avoided p.a.

Measured reduction

1.82 yrs

Estimated payback

Improved from 2.71 years

BUSINESS CASE VS MEASURED RESULT

Measured performance exceeded the pre-install estimate.

04 / BUSINESS OUTCOME

Measured. Defensible. Ready for a decision.

Operating environment

High traffic + extended hours

Pre-install estimate

25% annual HVAC savings

Measured result

42.7% annual HVAC savings

System approach

HDAC retrofit to existing HVAC